Indian Railways managed Mouni Amavasya rush with 244 special trains
These trains, run by 31 trains of Northern Railway (NR), 158 trains of North Central Railway (NCR), and 55 trains of North Eastern Railway (NER), served around 4.5 lakh passengers.
These trains, run by 31 trains of Northern Railway (NR), 158 trains of North Central Railway (NCR), and 55 trains of North Eastern Railway (NER), served around 4.5 lakh passengers.
General Manager of the North Central Zone Satish Kumar along with its Principal Chief Engineer Anup Kumar Aggarwal received the award from President Murmu, during the Energy Conservation Day event held in the national capital.
A total of 37 stations of NCR are now equipped with Train Display Board. 6 more stations were provided with coach display boards in 2021-22.
General Manager Pramod Kumar congratulated the efforts of BDUs and all the officers and their team members.
Naveen Kumar is an officer of the 1988 batch of Indian Railway Service of Electrical Engineering.
A team of high officials of NCR, RDSO and BLW led by Chief Electrical Locomotive Engineer (CELE) NCR PD Mishra was present during the trial.
Pramod Kumar is an officer of 1984 exam batch of Indian Engineering Services and has served Indian Railways in various capacities.
ICD Dadri has been an important loading point for NCR with an average loading of 6 container rakes per day.
The GM said that North Central Railway, in tune with the Prime Minister’s focus on “Jaan Bhi, Jahaan bhi” is committed to its best contributing to the growth of the nation’s economy and serving passengers to their satisfaction.
North Central Railway recruitment 2018: All the interested candidates can apply to the Apprentice posts on the official website by December 31, 2018.