Track maintenance completed in Malda division
The operation was conducted for shifting of a point of 1.25-metre. The adjustment plays a critical role in improving the alignment and long-term stability of the track infrastructure.
The operation was conducted for shifting of a point of 1.25-metre. The adjustment plays a critical role in improving the alignment and long-term stability of the track infrastructure.