Makeshift Ram temple made in Ayodhya, ‘Ramlalla’ idol will be placed on March 25
As per the reports, the platform will be ready in the temple by March 24, after which the Ramlalla idol will be placed on March 25.
As per the reports, the platform will be ready in the temple by March 24, after which the Ramlalla idol will be placed on March 25.