Railways achieves major breakthrough in Mumbai-Ahmedabad Bullet Train Project
This tunnel is 454 metres long with a width of 14.4 metres, and will accommodate both up and down tracks for the Mumbai–Ahmedabad Bullet Train project.
This tunnel is 454 metres long with a width of 14.4 metres, and will accommodate both up and down tracks for the Mumbai–Ahmedabad Bullet Train project.
The present estimates suggest that the cost of the entire project would be Rs1.08 lakh crore and attempts are being made to finish the project by December 2023.